Skip to content

Treatment · 10

Slope stabilisation

Rock bolting and shotcrete on cut faces, abutments and portal slopes, by whatever method the failure mode calls for.

Rock bolting · shotcrete Methods
Cut faces · abutments · portals Applied to
Pull out testing Verified by

Approach

Match the method to the failure mode.

Slope stabilisation is carried out by suitable methods — rock bolting and shotcrete being the two we apply most often on hydro project cut slopes and tunnel portals. Which one leads depends on whether the face is failing along joints, ravelling, or losing surface material to weathering.

Because we also run pull out testing of grouted rock anchors as an in-situ service, anchor performance on our own stabilisation work can be verified rather than assumed.

Rock face at a tunnel portal
Portal slope — a typical stabilisation location.

Next step

Get a method and a rate.

Send us the slope geometry and the observed failure mode.

Beantpreet Singh — Business Development +91 78883 13160 bd@rawelsinghco.in